News

Monster Energy Airfield UpdateBack to News >

25th January 2011 by Woodhill

The trail crew have resurfaced the mainline of the Pump Track and it is running hot.  The berms have been resurfaced making the lines so much more fun.  We also drilled drain holes in the Concrete tunnels meaning they will be dryer quicker after it rains.

The Midline of the jumps has had a make over making it super smooth and very predictable.

The Top 3 of the Mainline have also had a light groom and they are also riding very nicely.  Thanks to Nick D, Conor and Thom for their volunteer effort as well.

Comments are closed.